New Bathroom Time

Thank you

for giving us the opportunity to quote for your new bathroom project.

Dear Alexander Hoades,
At Crossman Craft Kitchens and Installations, we understand that every home (and every Bathroom) is unique and special. With many years experience, we can deliver you the bathroom that you have always wanted. Complete with the latest design technology to ensure everything is just perfect before we start any work.
This proposal includes details of your project, the plans, and the costings. This portal will be updated after your design meeting is complete and all decisions are finalised.
Crossman Craft Kitchens and Installations is your ideal renovation partner for your project and when you are ready to proceed, there is even a digital signature block ready for you to sign at the end of the process - no paper, no fuss!
I just wanted to re-cap on what’s included in our service (where required):
3D design service
Premium protection to your property
Decommissioning of the current installation
Waste disposal and removal from your home
All building materials to complete the job
Labour to complete all the specialist elements
Project management to ensure things go smooth
All Legal building notices where required by law
Your Chosen floor covering (samples will be provided)
Your chosen wall tiles (samples will be provided)
2 Year workmanship Guarantee
Up to 10 year product guarantee
If you have any questions, contact me on the details below.
Don’t forget to watch your video below:
Best Wishes,
Jonathan Crossman & Anna Phillips
Crossman Craft Kitchens and Installations
01449 541580

HIP

Why Choose Us?

Crossman Craft Kitchens and Installations is based in
Suffolk and has been developed by our founder
Jonathan Crossman & Anna Phillips who has years of experience in the trade.
After years of dealing with the bigger name bathroom suppliers and the frustrations that come along with them, from poor quality products and the hands-off approach to customer care and aftercare - Jonathan Crossman & Anna Phillips felt he needed to bring a new approach to the bathroom supply and installation industry in this area!
Crossman Craft Kitchens and Installations Guarantee That The Investment You Are About To Make In Your Home is 100% Risk Free.
We not only promise to safeguard your investment but we guarantee it.
Crossman Craft Kitchens and Installations have partnered with HIP (Home Improvement Protection) Insurance to protect you and your investment – here is why we have chose to work with HIP!

“HIP Safeguarding customers’ interests and have built up an outstanding reputation for trust, honesty and support, whilst raising the bar for standards within our industry. HIP protect our customers’ investments and properties by accrediting only carefully selected professional trades people with a proven history of delivering excellent customer satisfaction.”

Crossman Craft Kitchens and Installations have met the criteria to offer The HIP Guarantee so you are in safe hands!

We Promise, You Will Be 100% Satisfied With Your New Bathroom

Don’t just take our word for it…

We know that choosing a bathroom company can be challenging and confusing. Cheaper quotes will certainly lure you in but it’s a long term and big investment so be careful.

We have prepared some blogs here for you that will be very useful for gathering some further knowledge while making that choice.

Our Timescales

Below you can find the estimated timescales of work to deliver your new bathroom from start to finish.

Installation Dates:

Lead times can fluctuate with seasonal demand however the average lead in time is 6-8 weeks from signing your agreement and paying your deposit.

Please note we cannot secure your installation date prior to receiving your deposit.
Please ask for our current lead time before you order to avoid disappointment.

As you can appreciate your installation date is an estimate but we will keep you informed as the estimated start date approaches.

It is in our interest to get to you as soon as possible and we appreciate your understanding and patience should a delay to your installation occur.

When we arrive on the job, the timeline below explains what will happen - as a guide.

Phase 1
Removal

We begin with the messy stuff; removing your existing suite and tiling and preparing your bathroom for the remodel. The waste will be placed into a skip or left somewhere on the property grounds for collection at the end of the project (1 collection only). Whichever is most suitable for access.

Timeline: 1-3 days
Phase 1
Phase 2
First Fix & Building Work

Once the removal is complete, we will advise if anything unforeseen has been noticed by our team. Although this is rare there are some things that just cannot be identified on the survey such as rotting timber or anything else behind the previous bathroom or in the walls that you need to know about. Don’t worry we will help you through this process. We will then proceed to carry out all plumbing, electrical and plastering works listed in the quote.

Timeline: 2-5 days
Phase 2
Phase 3
Tiling & Flooring

Once the first fix & building work are complete, the tiling and flooring can then take place. Joinery and decoration work will usually take place at this stage also.

Timeline: 5-8 days
Phase 3
Phase 4
2nd Fix, Clean Up

The 2nd fix consists of installing all product items once the main bathroom install is complete.

If you've chosen the stone worktop option, it will have been templated once the majority of the bathroom fit has been installed. This process can take 7 days from templating to installation, but we will always make good use of the time by doing the other things we can while we wait—like your flooring, decorating, etc.

We always ensure that we leave our customer's kitchens and homes in tip-top condition; vacuuming and removing any dust and giving your kitchen the once over to make sure everything is working just fine. Oh, and take some nice photos!

Timeline: 2-4 days
Phase 4
Final Stage
Handover & Enjoy!

It’s now time to walk you through your new bathroom.

We will make sure that you are 100% happy with your new bathroom.

Ensuring that you have all the necessary documentation, we will show you how everything works and work through the all the features of your new bathroom.

Once you are completely happy with everything we will sign and issue you with your warranty certificate – and don’t forget that this is guaranteed with HIP!

Final Stage

Completion Date:

On average, your project should be completed within 10 to 15 days after we have started. Sometimes it is quicker and sometimes it can take a little longer. We will always set your expectations on how long we estimate your project to take before we start and let you know how it is going throughout the project.

Your 2D Bathroom Plan

Your New Bathroom

We will update this plan after the design session and this proposal will include a comprehensive estimate for the full range of services, labour, and materials required to bring the project to completion.

This renovation includes:

Clearance & Removal
Property Protection
Supporting works including plastering
Installation
Electrical
Tiling
Flooring
Decorating
Carpentry
Supply of the necessary products and Materials

Please see your 2D plan and quote breakdown in the project details for exact inclusions and exclusions. Items not listed or mentioned are not deemed included. Please ask if you have any questions or require clarification on anything.

Installation & Product Details

Below we have listed installation and product items that we have included in your costings.

Your 3D Designs

With our 3D visuals, you can explore your bathroom from every angle and make adjustments before the work begins, giving you peace of mind and the perfect plan for your dream bathroom.

3D Designs available after Your Design Session

It's not a fee.

It's an Investment.

Simplicity is beauty.

Like our bathrooms, we like to keep our pricing flexible and simple.

A bathroom is a fantastic investment in your everyday life and the future value of your home.

Based on the timescale and specifics outlined in this proposal, we estimate your project costings for an end to end service to be as follows:

Investment

Bathroom Installation
Overview This project covers the complete renovation and installation of a new bathroom, including all preparatory, plumbing, electrical, installation, and finishing works. Shower panel installation is included as part of the scope. Key Works Included Phase 1: Removal, Preparation, and Waste Collection Removal of sanitary ware Rip-out consumables kit (stop ends, isolation valves, tape, bags) Waste collection Installation of radiator/towel rail in new location Phase 2: Structural Works Timber studwork Use of bathroom cutting tools (multi-tool blades, grinder blades, diamond bits) Phase 3: Wall & Floor Preparation and Waterproofing Floor levelling screed Tanking kit for standard shower area Tile backer board installation (12mm for walls, 6mm for floor) Phase 4: First Fix Plumbing & Electrical Installation of chrome ceiling downlight (cool white) Phase 5: Sanitary Ware Installation Removal of floor/wall coverings Installation of shower tray and 40mm waste connection kit Drill tap holes and fit bath/basin taps Standard insurance-backed warranty Phase 6: Shower and Enclosure Installation Installation of shower door/cubicle, shower valve/thermostat (exposed) Installation of wall/ceiling mounted shower head and shower riser rail Phase 7: Tiling/Shower Boarding and Flooring Installation of washbowl/basin in existing location Installation of shower boards/panels (fit-only, 3 walls to 2.4m, no trims) Phase 8: Finishing and Decoration Installation of bathroom wall/ceiling fan extractor (including ducting) Application of finishing silicone, installation of accessories Emulsion ceiling (up to 4 sqm) Builder’s clean to room Phase 9: Products Supplied Example furniture from one of our ranges (e.g., Rhonda vanity with sink, Rhonda toilet box, back-to-wall toilet) Example shower panels as an option Remaining finishes as paint (other finishes available) Shower screen (normal), rotable return splash panel, towel radiator Straight valves, pipe sleeves & collars Special Notes The supplied furniture and shower panels are examples from our available ranges. We can re-quote and finalise the specification based on your choices and samples at the design visit. All works and products as detailed are included in the quoted investment. No hidden costs; deposit and upfront amounts as per proposal. Floor plan and final selections to be confirmed by the client at the design visit
£4,157.55
Bathroom Products, Tiles & Flooring
Products: Rhonda Vanity with sink Rhonda Toilet Box Back to wall toilet Low profile shower tray Shower Screen(Normal) Rotable Return Splash panel Towel Radiator Straight Valves Pipe Sleeves & Collars
£2,292.00
Piece of mind, no quibble warranty

Add-ons

Upgrade to 5 Year Warranty from the 3 Years as Standard
£299.00
Add Warranty
Add warranty add-on to my quote.

Total Price: £
0.00
inc VAT (£
0.00
)

Book Your Design Session

Arrange your design session

At the design meeting we will:

After the design meeting we will:

WhatsApp Image 2026-04-19 at 10.49.59
Best Wishes,
Jonathan Crossman & Anna Phillips
Crossman Craft Kitchens and Installations
01449 541580